Skip to main content

Attach the Mounting Strip — Gather Information and Tools

Beginner3 hours

Part of project

How to Measure Bathroom Plumbing Rough-In Dimensions for a New Vanity · Step 1 of 6

Helpful?

In this video

First, determine your desired vanity height (standard is 34 inches) and mark the location for the mounting strip on the wall, typically 2 inches below the final vanity top height. Use a level to draw a straight horizontal line at this mark. Use a stud finder to locate and mark the studs along this line. Then, draw a vertical plumb line centered with your existing plumbing to find the center point for your vanity. Drill a hole at the intersection of your center plumb line and horizontal line and insert a drywall anchor if there is no stud present. Attach the mounting strip to the wall, first securing it at the center anchor. Level the strip, then drill and drive mounting screws into the marked stud locations to secure it firmly.

Goal: Securely mount the support strip to the wall

  • Mark the mounting strip location 2 inches below the desired vanity top height.
  • Studs are typically located 16 inches apart on center.

Used in this video

  • Measuring Tape (Tool Type: Measuring Tools)Measuring the desired height of the vanity
  • Pencil (Tool Type: Hand Tools)Marking lines and locations on the wall
  • Level (Tool Type: Measuring Tools, Level: 4-foot level)Drawing a level line for the mounting strip
  • Stud Finder (Tool Type: Measuring Tools)Locating wall studs for secure attachment
  • Drill (brand: Ridgid, Drill: Cordless drill, Power Source: Battery)Drilling holes for anchors and screws
  • Phillips Screwdriver (Screwdriver: Phillips head, Tool Type: Hand Tools)Installing the drywall anchor
182.3K views34345 minutes
Bathroom Remodeling Teacher

278K subscribers

View Channel

FAQs

Is this project genuinely beginner-friendly, and can I expect to complete the measuring process within the estimated 3 hours?

Yes, this project is well-suited for beginners as it primarily involves careful measuring and marking, not actual plumbing installation. The 3-hour estimate is realistic, assuming you have all your tools and the new vanity's specifications readily available. Accuracy is more important than speed for this step.

Do I need the specific brand-name tape measures listed, or can I use a standard measuring tape and level?

While specific brands are listed for tools, any standard, accurate 25 ft. tape measure and a reliable 2-foot level will work perfectly. The critical factor is ensuring your tools are in good working order and provide clear, precise readings for accurate marking on the wall.

What are the most critical measurements to double-check to avoid costly errors during the rough-in process?

The most critical measurements are the vanity's centerline, the height and horizontal spacing of the drain pipe, and the hot/cold supply lines. Always double-check these against your new vanity's internal dimensions, especially where the sink basin, P-trap, and supply lines will connect, to ensure everything fits without obstruction.

Before marking the wall, should I take any precautions regarding existing pipes or electrical wiring that might be behind the drywall?

While you are only marking the wall, it's a good practice to use a stud finder with AC detection to identify potential electrical lines or hidden studs. This awareness can help you avoid marking directly over sensitive areas, which is beneficial if you later need to cut into the wall for actual plumbing work.

Transcript
Hide

flat head screwdriver, silicone, and a cloth. Begin by attaching the mounting strip. Determine your desired vanity height, standard height is 34 inches. Look the mounting strip location, leaving 2 inches to account for the actual mounting strip location. Using a level, create a line from the determined mark. Using a stud finder along the created line, locate and mark the two wooden studs that are behind the wall. In this specific case, there are two studs positioned at approximately 16 inches apart. Using a level, create a plumb line that is directly in the center of the existing plumbing and intersects with the horizontal mounting strip line. At this intersection, use the appropriate drill bit for the anchors provided and drill out a mounting hole. Insert an anchor that is provided and screw it in until it is flush with the wall. In this specific case, only one anchor is necessary. But in other situations where there may be only one stud behind the wall, multiple anchors will be used. Attach the mounting strip at the center where the anchor was inserted, tighten accordingly. Adjust the mounting strip using a level, then using the mounting screws provided, attach the mounting strip at the marked stud locations, tighten accordingly. Now let's hang the vanity.

Auto-generated transcript. May contain errors.