Skip to main content

Test Drains for Proper Flow — Rough-in Inspection

Intermediate

Part of project

How to Rough-In Plumbing for a Basement Bathroom · Step 5 of 6

Helpful?

In this video

After snaking the line, the plumber goes inside the house to confirm the clog has been cleared. He systematically tests all the plumbing fixtures. He flushes both toilets and turns on the faucets in the sinks and showers. This sends a large volume of water down the main line, ensuring it can handle a normal load without backing up. He inspects the bathtub, which was previously full of sewage, to confirm it is now draining properly.

Goal: Verify clog is cleared

16.5K views335 minutes
Benjamin Sahlstrom

462K subscribers

View Channel

FAQs

Are there any specialized tools required for cutting or joining PVC for the DWV system that I might not already own?

Yes, you'll definitely need a dedicated PVC pipe cutter, such as the Crescent 2-1/8 in. Ratcheting PVC Pipe Cutter, for clean, precise cuts. Additionally, a reamer and deburring tool, like the Husky 1-5/8 in. Inner/Outer Reamer, is crucial for smoothing pipe edges to ensure proper, leak-free solvent welds. A sturdy tape measure and marker for accurate layout are also indispensable.

What critical safety precautions should I take when breaking up concrete and working in a dusty basement environment?

When breaking concrete, always wear heavy-duty safety glasses, hearing protection, gloves, and steel-toed boots. For the dusty environment, a high-quality dust mask or respirator is essential to protect your lungs from concrete dust. Ensure good ventilation by opening windows or using fans, and be aware of any existing buried utilities before you start digging.

Given the 'intermediate' difficulty, how much time should I realistically allocate for roughing-in basement plumbing, and what are the primary cost drivers?

Realistically, this intermediate project can take a dedicated DIYer anywhere from 3 to 7 full days, depending on prior experience and the complexity of your bathroom layout. The primary cost drivers will be the PVC DWV pipes and fittings, PEX water supply lines, and the concrete repair materials like gravel and concrete mix. Don't forget to factor in permit fees and potential tool rentals.

What are the most common mistakes DIYers make with the DWV system (drain, waste, vent) layout, especially regarding proper slope and venting, that could lead to inspection failure?

A frequent mistake is failing to maintain the correct pipe slope, typically 1/4 inch per foot, for proper drainage, which can lead to clogs. Another common error is inadequate or improperly installed venting, which can cause drain traps to siphon and emit sewer gas. Always consult your local plumbing codes carefully and use a level constantly to ensure correct slope and alignment.

Transcript
Hide

It's not going to run off this thing in a heartbeat. We put in about, I would say, a hundred feet or so. I'm just checking a question of course. One of those things. As you can see, he was backing up from the shower. Being the lowest point. There's no basement. This is a ranch house. Two bathrooms in the kitchen. This is the closest point to the street. We got the shower going. Question of course. Running the faucets. Wasn't really able to record anything because being on a roof and a rush because of the storm. Wasn't able to catch any footage. Just a comment making. No big deal. Let's just know what we find.

Auto-generated transcript. May contain errors.